Other areas may copy Bali's waste system - Bali Board
Bali Board  

Zurück   Bali Board > Off Topic(s) > Pressemitteilungen aller Art
Registrieren Hilfe Benutzerliste Kalender Heutige Beiträge

Antwort
 
Themen-Optionen Thema durchsuchen Ansicht
Alt 30.06.2008, 12:48   #1
Juergen Volkmann
Routinier
 
Benutzerbild von Juergen Volkmann
 
Registriert seit: 13.05.2008
Beiträge: 365
Juergen Volkmann befindet sich auf einem aufstrebenden Ast
Other areas may copy Bali's waste system

Other areas may copy Bali's waste system
Irawaty Wardany, The Jakarta Post, Denpasar, 06/30/2008 10:49 AM



Several regional heads in Indonesia have expressed interest in implementing an organic
waste management system using recycling technology similar to the one currently being
constructed in Bali, an executive of the waste management company said Saturday.

The recycling technology transforms the waste into electricity.

The regions interested are Jakarta, Bekasi, West Java and Palembang in South Sumatra.

"We are currently in discussion with those regions' administrations, but we haven't
reached any agreements so far," said Soeyoto, director of PT Navigat Organic Energy
Indonesia.

Unfortunately, their plan to build the waste management plants in the regions faced many
obstacles, he said.

"One of the obstacles is regional regulation," he said.

He said some regional regulations consider waste as the region's asset.

Consequently, the management of waste, including the appointment of a private company to
handle it, needs to be decided and conducted through a long legal and bureaucratic
process.

"We did not encounter such problems in Bali. The local administration selected the best
waste management company and the most appropriate technology for the region," he said.

PT Navigat is now in the process of constructing the waste plant in Suwung, Denpasar, on
a 10-hectare plot of land provided by the provincial administration.

The plant, Soeyoto said, would be able to process 800 tons of garbage per day and
produce 2 MW of electricity. The operational capacity will be reached by October this
year.

The capacity will be increased to reach 9.6 MW in 2010.

The waste will go through a multi-phase process; from gasification to anaerobic digestion.

The wet organic waste is separated from dry waste. The wet waste is crushed, dried and
later transformed into compost. The compost undergoes a process called anaerobic
digestion to produce gas. The dry organic waste goes through pyrolyzes and the
gasification processes.

Gasification is the thermal process of converting biomass into combustible gases. This
process will produce synthetic gas, which can be converted into electricity.

Soeyoto said his company only needed commitment from the local authority to provide land
to build the plant and a continuous supply of garbage.

"We need a minimum of 500 tons of garbage per day," he said.

He said the technology would produce zero waste and assured regional administrations
they would not have to deal with excess waste.


Source URL: http://www.thejakartapost.com/news/2...te-system.html

(Ich hab mal die URL mitgepostet, da die JP seit dem neunen Outfit jetzt offensichtlich ein besser funktionierendes System hat:-D)
Juergen Volkmann jest offline   Mit Zitat antworten
Antwort


Mitglieder, welche das Thema gelesen haben : 15
Ali, Andy64, Cekcek, Flüsterer, garuda, johannes, Juergen Volkmann, lucu, Mahalo, PetraZ, pingerlo, roxana, Susie, Warkop

Forumregeln
Es ist Ihnen nicht erlaubt, neue Themen zu verfassen.
Es ist Ihnen nicht erlaubt, auf Beiträge zu antworten.
Es ist Ihnen nicht erlaubt, Anhänge hochzuladen.
Es ist Ihnen nicht erlaubt, Ihre Beiträge zu bearbeiten.

BB-Code ist an.
Smileys sind an.
[IMG] Code ist an.
HTML-Code ist aus.

Gehe zu

Ähnliche Themen
Thema Autor Forum Antworten Letzter Beitrag
New Carry-on Rules at Bali's Airport pingerlo Pressemitteilungen aller Art 0 26.03.2007 07:51
Bali's gegenwärtige "Verschwiegenheit" traveltho Gesundheit 2 05.11.2006 11:28
Tsunami Alarm System dowe Pressemitteilungen aller Art 0 10.08.2006 14:20


Alle Zeitangaben in WEZ +2. Es ist jetzt 08:41 Uhr.


Powered by vBulletin® Version 3.8.10 (Deutsch)
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Template-Modifikationen durch TMS
Bali-Style Copyright © 2006 by PT Dr. Moll IT Solutions, Sanur, Bali, Indonesia